Ward Village in 2027: Melia, ʻIlima and Mahana Compared

Posted by benjamen.harper@gmail.com on November 25, 2026
0

Ward Village in Kakaʻako has three new towers in different stages. Melia and ʻIlima broke ground on September 28, 2026 and are scheduled to open in 2030. Mahana, the next tower, opened its sales gallery in August. If you’re thinking about buying a new condo in Honolulu, here’s how the three compare and what will change in the neighborhood during 2027.

The three towers side by side

  • Melia: 221 homes in a 35-story tower, from one-bedrooms to penthouses, about 781 to 3,819 square feet. About half had been presold by September 2025. Scheduled to open in 2030.
  • ʻIlima: 148 homes in a 33-story tower, two- to six-bedroom residences and penthouses, about 1,782 to 5,252 square feet. Developed with Discovery Land Company. About 41 percent presold by September 2025. Scheduled to open in 2030.
  • Mahana: 451 homes at 423 Ward Avenue across from Victoria Ward Park, from studios to three-bedrooms, in a tower just under 400 feet tall with about 13,600 square feet of street-level retail. No completion date has been announced.

Melia and ʻIlima were designed by Robert A.M. Stern Architects and together add about 20,000 square feet of retail. Ward Village hasn’t published prices for any of the three, so we don’t quote prices here. If you’re interested, the sales gallery or a buyer’s agent can give you current pricing and availability.

How they differ

The main difference is size and price point. ʻIlima is the largest-unit, highest-end of the three, with no unit smaller than about 1,800 square feet. Melia covers a wider range, from one-bedrooms up. Mahana has the smallest units, including studios, and will likely be the most accessible way to buy new at Ward Village.

Timing is the other difference. Melia and ʻIlima are under construction with a 2030 opening. Mahana’s start date isn’t settled. The Hawaiʻi Community Development Authority’s records point to 2028, while the developer has said construction could start within roughly the next year. If you buy at Mahana, expect a longer wait than at the other two.

What changes in 2027

Ward Centre closed on June 30, 2026, and demolition is expected to finish in early 2027. That clears space for the next phase of the neighborhood. Meanwhile, recently finished towers are filling in: Victoria Place (350 homes) was completed in November 2024, Ulana (697 reserved homes) in November 2025 and The Park (546 homes) in June 2026.

For buyers, that means more construction around the Ward area in 2027, along with more residents, shops and foot traffic as the newer towers settle in.

Things to think about before you buy pre-construction

  • Deposits and timing. Pre-construction purchases usually require deposits in stages, and you won’t move in for several years. Make sure the schedule works with your plans.
  • Financing. You’ll need a mortgage at closing, not at signing. Rates in 2030 may be very different from today’s.
  • Monthly costs. Ask for the projected maintenance fee budget. New buildings often start with lower fees that rise once the building is fully operating. Our post on Honolulu condo fees and insurance explains what to look for.
  • Rental rules. Ward Village isn’t in a resort zone, so short-term vacation rentals generally aren’t allowed. See our post on Oahu’s rental rules.

If you’d rather buy something you can move into now, there are resale units in the finished Ward Village towers and elsewhere in Kakaʻako. Our Ala Moana and Kakaʻako condo guide is a good place to start, or reach out and we can send you what’s available.

Tower details are from Ward Village and Howard Hughes announcements and the Hawaiʻi Community Development Authority. Plans and timelines can change.